The project comprised the closure of a hazardous waste landfill cell of 14,000 m2. The closure includes providing a solution for containing waste inside the cell border, reshaping the side slopes without moving waste, provide a plan for gas collection system and treatment and improving the efficiency of evaporation ponds and leachate collection system
Client | : | Waste Management Regulatory Authority (WMRA) |
---|---|---|
Funding Agency | : | Waste Management Regulatory Authority (WMRA) |
Country | : | Egypt |
Project Duration | : | 12-2021 - on going |
Sector | : | Waste Management |
Service | : | Design and Site Engineering of Sanitary Landfills, Tender Documents, Construction Supervision |